Pilot & First Production Inspections

PILOT Pilot & First Production Inspection Verification of the first production run against approved samples before volume commitment. Identifies tooling issues, material substitutions, and process deviations where corrections are least expensive. Get a Quote The inspection between sample approval and mass production A Pilot Inspection is conducted on the first…
Read More

During Production Inspections

DUPRO During Production Inspection Mid-production check at 20 to 80% completion. Identifies systemic defects while corrections are still possible, before a batch-level failure becomes a full-shipment problem. Get a Quote Catch the problem before it’s built into 10,000 units A DUPRO is conducted mid-production, typically when 20 to 80% of…
Read More

Final Random Inspections

FRI Final Random Inspection Pre-shipment verification at 80 to 100% production completion. AQL sampling to ISO 2859-1. Clear pass or fail before goods leave the factory. Get a Quote The last quality checkpoint before your container is sealed An FRI is conducted when production is 80 to 100% complete and…
Read More

Container Loading Checks

CLI Container Loading Inspection Final confirmation before the container doors close. Correct goods. Correct condition. Correct quantity. Properly loaded. Get a Quote The inspection that happens at the loading dock A CLI takes place as goods are being loaded into the shipping container. The inspector verifies that the correct products,…
Read More

Factory Audits

AUDIT Factory Audit Structured assessment of production capability, management systems, quality controls, and compliance readiness. Scored report with corrective action recommendations. Request an Audit Know who you’re sourcing from before you commit A factory audit is a structured on-site assessment that gives you a complete picture of a supplier’s production…
Read More